Finished bathrooms, waste and drainage, and the pipework that goes in before the slab is poured. Tap any photo to see it full size.
Setting out pipework for an upper floor slab, before the pour.Twin-vessel water filtration system, installed and plumbed in.Soil stack laid into the slab before the pour, Ibadan.Gold-trim pedestal basin and one-piece WC, with bidet spray.External waste and drainage, set out and levelled to the gully.Rain-shower column, mixer and close-coupled WC.Close-coupled WC fitted in a finished marble bathroom.Waste and soil stub-ups set out before the floor slab.Hard hat, hi-vis, every site.Every run laid to fall, every joint clipped.Neat, parallel, accessible: pipework you can maintain.
On video
A recent job, start to finish
See how a Princekay crew works on site: setting out, jointing, testing and finishing clean.
What we take on
Repairs, installs and everything in between
Supply pipework, chased and fixed.
Under-sink waste and supply.
Water heater installation and repair.
WC and cistern repairs.
Bathroom leak repair.
Valves and pump-room pipework.
01 / 06
Want a finish like this?
Tell us about the job. We'll inspect for free and quote in writing — economy, standard or premium.